ACCELERATE YOURCONSTRUCTION SCHEDULE
Track schedule performance across your projects in real-time. This is not a static Gantt chart or just another P6 export. This is true AI-powered schedule intelligence.
Introducing Your
SCHEDULEINTELLIGENCEDASHBOARD
The film · 3:09
Built for the teams behind capital projects
EPC Contractors, Energy & Utilities, Infrastructure Owners, Mining & Resources, Oil & Gas, Transport & Logistics
A NEW STANDARD OF PROJECT SCHEDULING
Our AI engine reads your XER and XML files natively, builds a living interactive Gantt you can filter and interrogate in plain English. The forensic engine identifies every change between schedule versions — and tells you what it means for your critical path.
CRITICAL PATH
MONITORING
Instantly understand your critical path drift in real-time. Minimize risks and enable confident, informed decision-making so you can manage your project schedule.
FORENSIC
ANALYSIS
Our automated forensic comparison engine provides the insights you need to ensure your schedule integrity, giving you more time to focus on what really matters — delivering results.
DELAY
PREVENTION
Get ahead of surprise delays with proactive drift alerts and AI-powered delay narrative generation. Take charge of your schedule and gain the competitive edge now.
PUT SCHEDULE INTELLIGENCE TO WORK ON YOUR PROJECT
SEE IT ON YOUR PROJECTInteractive Gantt Visualization
Navigate through thousands of activities with real-time P6 fidelity. Filter by discipline, package, phase, or critical path — all in your browser.
INTERACTIVE GANTTVISUALIZATION
Your P6 data, alive. Navigate through thousands of activities with full scheduling fidelity directly in your browser. Filter by WBS level, discipline, package, or critical path status. Search activities in plain English. Drill into any bar to see predecessors, successors, constraints, and resource loading — all synchronized with your latest XER or XML upload.
FORENSIC SCHEDULECOMPARISON
Compare any two schedule versions side-by-side with surgical precision. Every added, deleted, or modified activity is surfaced with full context on what changed and why it matters. The engine catches float manipulation, logic changes, duration compression, and constraint modifications that manual review misses.
Between Rev 6 and Rev 7, 23 activities changed and 6 became critical.
The driving change is a 12-day extension to NGT.ENG.PR-10206, which consumed the remaining float on the mechanical chain and pushed Handover to 04 Aug.
Two logic edits and one added constraint contributed a further 4 days of drift.
Forensic Schedule Comparison
Side-by-side baseline comparison with automatic change detection. Every modified activity, logic change, and float manipulation surfaced instantly.
Critical Path & Drift Monitoring
Real-time tracking of your critical and near-critical paths. Automated alerts when activities drift, with projected impact analysis.
CRITICAL PATH &DRIFT MONITORING
Track drift on your critical and near-critical paths with 24/7 automated monitoring. Get early warnings before delays cascade into major problems. The system calculates downstream impact across every connected dimension — cost implications, risk exposure, and contractual notice obligations.
A SCHEDULE BUILTFROM YOUR DOCUMENTS
Start from your documents, not from a blank page. Give Schedule Intelligence the scope, the contract and the drawing list, and it drafts a first schedule: the structure, the activities and the sequence, each one traced back to the document it came from. It draws on proven construction sequences and on the schedules your organization has already delivered. Your planners review it, adjust it and approve it.
Welcome — I'm your Schedule AI Expert, ready to analyze, modify and optimize your schedule.
Currently working on: NGT-2 (Live Schedule)
Try: “What is the critical path?”, “Remove link between A and B”, or “Can we finish by March 15?”
Schedule from documents
A first schedule drafted from the scope, the contract and the drawing list, with its sources, ready for your planners to review.
4D Scheduling
The live schedule on the 3D model, as of the latest progress update.
THE SCHEDULE,IN 3D
Put the schedule on the project's 3D model and play it by date. See what is built, what is under way and what comes next, bring in the progress your site reports every week, and compare a recovery plan with the current one.
FORECASTING AND EXECUTION
Construction planners benefit from schedule intelligence features that make forecasting and project delivery a breeze. Make use of Verian's full end-to-end solution to increase efficiency in supervising key advancements.
EASILY
TRACK PROGRESS
Compare your project's current schedule against the original plan to determine precisely where it stands, where it needs to go, and how to move forward.
EXACT
DELAY ANALYSIS
Don't rely on estimates and subjective reporting. View exact forensic comparisons and AI-generated delay narratives to take action accordingly.
ACCURATE
FLOAT TRACKING
Rest assured as Verian's schedule intelligence solution monitors float consumption in real time, straight from your latest schedule data.
SCHEDULE INTELLIGENCE ON EVERY REVISION
SEE IT ON YOUR PROJECTMAKE PLANADJUSTMENTS
Quicker access to schedule data means construction professionals can adjust their plans with ease when contingencies occur. The result: less stress and a better handle on your projects, even when plans suddenly change.
STANDARDIZEDREPORTING
Streamline management with standardized schedule metrics across the whole project. Planners spend less time converting data from multiple sources and more time analyzing information on hand to propel their projects forward.
ENSURESEAMLESS INTEGRATION
Connect directly with Primavera P6, Microsoft Project, and other scheduling tools your team already uses. Bidirectional sync means your data is always current across cost, risk, and contract modules.
THIS ISN'T AI BOLTED ON.IT'S AI BUILT IN.
Verian's schedule AI doesn't just display your data — it understands it. When something changes, it immediately calculates the downstream impact across every connected module — cost, risk, contracts.
Ask your schedule questions in plain English. "Which activities slipped more than 5 days?" "Show me the critical path for Phase 3." "What happens if we accelerate the mechanical package by two weeks?" — and get instant, data-driven answers.
23 activities changed and 6 became critical. The driver is a 12-day extension to NGT.ENG.PR-10206, which erased the float on the mechanical chain.
Projected handover is 04 Aug (+12d). Two options recover it:
Every figure links back to the activity that produced it.
AI-Powered Schedule Intelligence
Watch how Verian's AI analyzes schedule changes, calculates cross-module impact, and generates delay narratives — all in seconds.
WANT US TO RUN IT FOR YOU?
Start with a first call about one project. We look at the fit together, and you choose the platform only or the platform with our team running Schedule Intelligence for you.