EVERY CHANGE.
FOUR DIMENSIONS.
Assess every change across schedule, cost, scope, and risk—simultaneously. Full committee workflows, automated impact analysis, and complete audit trails before any decision is made.
Four-Dimensional Assessment
THE CONTROL GRID
Schedule
Evaluate timeline compression, critical-path drift, and float erosion before any change is approved.
Cost
Quantify budget impact, contingency drawdown, and earned-value deviation in real time.
Scope
Trace scope changes through every deliverable, WBS element, and contract clause.
Risk
Model risk exposure shifts, trigger new mitigations, and update your risk register automatically.
Unforeseen groundwater required additional dewatering to the foundation pours. The works are on the critical path; float was already exhausted by the Zone B access restriction.
Recommended: approve with a 9-day extension of time and draw $214k from contingency.
Workflow
FROM INITIATION TO IMPLEMENTATION
Impact Analysis
SEE THE
RIPPLE EFFECT
Every change sends waves across the project. A scope adjustment shifts cost. Cost shifts timeline. Timeline shifts risk. Our impact analysis visualises these cascading dependencies so you can see the full picture before making a decision.
- Downstream impact projection across full baseline
- Side-by-side approve / defer / reject scenarios
- Auto-flagging when tolerance thresholds are breached
- Cross-dimension dependency mapping
TAKE CONTROL
OF CHANGE
Stop managing changes in spreadsheets and email threads. See how Verian brings four-dimensional impact assessment and structured committee workflows to every change on your project.