Blog
Textes sur le contrôle de projet des grands projets : latence des décisions, risque planning, avancement du chantier, et la conduite d'une IA en revue. Articles en anglais.
L’équipe Verian
· 12 min de lecture
A thousand tomorrows before breakfast
Simulation used to be a yearly exercise with a consultant and a report. Compute is now cheap enough to run the whole project a thousand times every night, show each decision as a spread of outcomes on the 3D model, and still leave the choice to a person.
L’équipe Verian
· 9 min de lecture
A week inside Verian: from a supplier's letter to an approved recovery
One fact, followed through the platform for three days: a letter is read, a risk is proposed, a question is answered in the review, three recoveries are tried, and one is approved onto the live schedule with a name on it.
L’équipe Verian
· 8 min de lecture
Figures by tools, sentences by the model: how Verian answers
A language model is good at words and unreliable with numbers. Verian keeps the two apart: every figure in an answer is computed by a tool from the project record and cited, and the model only writes the sentence around it.
L’équipe Verian
· 13 min de lecture
The night shift: agents will run project controls while you sleep
An agent is a worker with one job, one tool belt and a boss. Give a project five of them and a night, and the morning starts with three proposals waiting for a signature instead of three hours of gathering data.